Tanks renewable process was begun in Distillation Area for solvent tanks of 130 M3 each. Old tanks were demolished and new ones fabricated and tested since 2016, some were put in operation.
To continue the renovation process, APC chooses a new Technology, to replace the fixed tanks with fixed and Aluminum Floating roof.
[M9 - M12] were fabricated with the new concept by PETROMAINT as main Contractor.
The Hydrostatic test was Finished for M10 & M12 While M9 & M11 are Prepared for the test soon. All Bottom, shell fabrication were finished, the internal floating roof were erected and just remaining activity of Sand blasting is waiting.